top of page

PROJECTS

IMG_8813_edited.jpg

Optus Stadium - Perth

A five tiered stadium requiring nearly 20,000m of insulated pipe, including metal sheathing in all plant rooms.

Stocklands Green Hills.jfif

Stocklands Shopping Centre - Green Hills

The original single level shopping centre was expanded to two levels, increasing from a floor plan of roughly 30,000m2 to over 70,000m2. This upgrade required over 12,000m2 of insulated duct work and insulated and sheathed pipe work connecting the primary plant room to many AHU Rooms.

TPN Wynyard.jpg

Wynyard Place - Sydney

Consisting of two buildings above Wynyard Station, a 30 storey tower and the adjacent Shell House, this project will entail insulating up to 16,000m2 of duct work and 20kms of insulated pipe work.

IMG_4479.jpg

Airtrunk - Sydney

Linking multiple buildings of Australia's largest hyper scale date centre, we insulated pipe work connecting 27 Chillers to 102 CRAH's with metal sheathing of all pipe work on roof level and within the building to a height of 3m.

SHOR-ST-LEONARDS-HEALTH-ORGANISATION-REL

St Leonards Health Organisation Relocation

This nine storey building was established to consolidate 11 government departments into one. We installed nearly 5,000m2 of duct insulation externally.

canberra-case-study.png

Canberra Data Centres - Hume and Fyshwick ACT

We have been insulating and metal sheathing pipe work at both the Hume and Fyshwick sites from CDC's foundation there nearly 15 years ago.

SA6.jfif

SA6 ANU Student Accommodation - ACT

Bruce Hall and Wright Hall make up the two 8 storey ANU accommodation buildings that provide residence for over 800 students, each room being fitted with heating requiring insulated pipe work throughout.

Lismore_Hospital_10.jpg

Lismore Base Hospital

This project was completed over two stages with a total of 20,000m2 of external duct insulation and 1,000m2 of FyreWrap.

google-sydney-022-1024x676.jpg

Google PIR - Sydney

Extensive acoustic, duct and pipe insulation works were completed on the existing HVAC system to meet the new floor plan by Google. From Level 2-6, 42 Chill Beams and 57 FCU's were added including a basement level chiller plant room.

bottom of page